Capability and Costs of Motor-manual Delimbing and Bucking (Case Study: Kheyrud Forest)

Document Type : Research Paper

Authors

1 Assistant Professor, Department of Forestry and Forest Economics, Faculty of Natural Resources, University of Tehran, Karaj, Iran

2 Professor, Department of Forestry and Forest Economics, Faculty of Natural Resources, University of Tehran, Karaj, Iran

3 Associate Professor, Department of Forestry and Forest Economics, Faculty of Natural Resources, University of Tehran, Karaj, Iran

Abstract

Tree felling, delimbing and bucking includes all activities undertaken to fell standing trees and prepare them for extraction. The study was conducted in Gorazbon district in the Hyrcanian forests. In this study, the objectives were to discover the special characteristics in the time consumption of manual tree delimbing and bucking, productivity and costs, and develop regression model. The continuous time study was conducted with professional operators for chain-saw delimbing and bucking and the cycles were broken down into time elements. Tree delimbing time of working crew is the most time-consuming element in delimbing and bucking, followed by bucking and rest and meal time. The operational and personal delay is the most time-consuming delay time in tree delimbing and bucking. Result showed that time consumption for delimbing and bucking was increased with increasing diameter. Labor costs accounted for 37% of the hourly cost while only 1.5% was related to machine cost. A significant linear relationship was found between delimbing and bucking cycle time and diameter. Productivity of chainsaw delimbing and bucking was increasing related to tree DBH as power. The costs of chainsaw delimbing and bucking with and without delay time were 203710 and 179796 Rial/m3, respectively. The cost of delimbing and bucking was increased as simple exponential equation when DBH of harvested tree was decreased. However, the unit delimbing and bucking cost for chainsaw operation decreased as tree size increased. Total delimbing and bucking cycle time without delay averaged 25.31 minutes and with delay time were averaged 22.34 minutes.
 
 

Keywords


[1]. Dykstra, D., and Heinrich, R. (1996). FAO. Model code of forest harvesting practice. Rome, FAO. 85 p.
[2]. Sarikhani, N. (2008). Forest utilization. Tehran University, Tehran. 728 p.
[3]. Sessions, J. K., Boston, G., Murphy, M.G., Wing, L., Kellogg, S., Pilkerton, J.C., Zweede, and Heinrich, R. (2007). Harvesting operation in the Tropics. Springer-Verlag, Berlin, Heidelberg. 170 p.
[4]. Conway, S. (1979). Logging practice, principle of timber harvesting system. Miller Freeman, USA, 416 p.
[5]. Lortz, D., Kluender, R., McCoy, W., Stokes, B., and Klepac, J. (1997). Manual felling time and productivity in southern forests. Forest Product Journal, 47(10): 59-63.
[6]. Wang, J., Long, C., McNeel, J., and Baumgras, J. (2004). Productivity and cost of manual felling and cable skidding in central Appalachain hardwood forests. Forest Product Journal, 54(12): 45-51.
[7]. Li, Y., Wang, J., Miller, G., and McNeel, J. (2006). Production economics of harvesting small-diameter hardwood stands in central Appalachia. Forest Product Journal, 56(3): 81-86.
[8]. Nikooy, M. (2007). Optimizing Production Cost and Damage Reduction to Wood, Trees and Forest by Harvest Planning (Case Study: Asalem Forest District area). Ph.D. Thesis. Natural Resources Faculty. University of Tehran. 215 p.
[9]. Behjou, F.K., Majnounian, B., Dvorák, J., Namiranian, M., Saeed, A., and Feghhi, J. (2009). Productivity and cost of manual felling with a chainsaw in Caspian forests. Journal of Forest Sceince, 55(2): 96–100.
[10]. Ershadifar, M., Nikooy, M., and Naghdi, R. (2011). Ability assessment of felling crew in directional felling in west forest of Guilan province. Iranian Journal of Forest, 3(2): 169-176.
[11]. Pearce, K., and Stenzel, G. (1972). Logging and pulp wood production, John Wiley & Sons, 453 p.
[12]. Anonymous. (2010). Gorazbon forest management plan. Department of Forestry and Forest economics. Faculty of Natural Resources. University of Tehran. 460 p.
[13]. Bjorheden, R., and Thompson, M.A. (1995). An International Nomenclature for Forest Work Study. Paper presented at the XX IUFRO World Congress, Tampere, 6-12 August 1995. 16 p.
[14]. Spinelli, R., and Visser, R. (2008). Analyzing and estimating delays in wood chipping operations. Biomass and Bioenergy, 3: 1-5.
[15]. Sobhani, H., and Rafatneia, N. (1997). Guideline for forest harvesting plan. Forest, Range and Watershed Management Organization. Iran. 39 p.